Benoi Road: Production Plant

Home / / Benoi Road: Production Plant

ROADWAY: JURONG ISLAND

  Before: Before: T8 x 02 Battan Type After: Eco Green LVD – 03 – 022 – 80W
Total Consumption/ Year 13,432 KW 5,069 KW
Lux level 90 Lux 150 Lux
Utilities Saved/Year $3,586.3 $1,353.4

 

Related Projects
Indonesia PrintPrint